• Lietuviškai
  • English
  • Русский
    • Lietuviškai
    • English
    • Русский
    Arginta
    Arginta
    Arginta Group - įmonių grupė
    Menu
    Home
    • About Arginta
      • Quality assurance
      • Certificates
      • Acknowledgment
      • Staff training & education
    • Products and services
      • Design and modeling
      • Consultancy
      • Project Development
        • Drinking water treatment plants (WTP)
          • Underground drinking water treatment plants
          • Surface drinking water treatment plants
          • Industrial water treatment plants
        • Wastewater treatment plan (WWTP)
          • Conventional (WWTP)
          • Compact WWTP
          • Ultra Compact WWTP
          • Other technologies
        • Sludge treatment plant (STP)
          • Sludge thickening and dewatering
          • Sludge digesting and green energy from biogas
          • Sludge disintegration
          • Sludge drying and incineration
          • Sludge composting
          • Other Sludge treatment technologies
        • Pumping stations (PS)
          • Wastewater PS
          • Sludge PS
          • Water pressure (boosting) PS
          • Underground water wells
    • Research & Development
    • Reference
    • News
    • Downloads
    • Contacts
    • Arginta
    • Arginta Group
    • Arginta Engineering
    Extranet
    • Home
    • Compact WWTP

    Design and construction/reconstruction of compact WWTP

    Usually, town WWTP for plants < 60 000 PE (population equivalent ) or < 10 000 m3/d flow is designed without primary clarifiers. In some case, when suspended solid (SS) concentration in wastewater <300 mg/l for plants up to 20 000 m3/d primary clarifiers are also not necessary. For plants of this size we propose compact WWTP solution.

    Word “compact” does not mean some type of biologic wastewater treatment technology, but it means, that major WWTP chains are blocked together:

    • For plants 5 000 < 10 000 m3/d we propose to design blocked biological reactor with secondary clarifier. This solution enables to save construction place up to 2 times, comparing with separate displacement. Also it aloud to avoid to install additional pumping stations and chambers, required to internal recirculation or other needs, pumps are installed directly inside of bioreactor.
    • For plants 1 000 < 5 000 m3/d in addition blocked biological reactor with secondary clarifier, we propose to design integrated complex mechanical treatment units instead of separate screens and grit chambers. This solution enables to save construction place for pretreatment up to 3 times and makes operation of pretreatment equipment much more simple and robust.
    • For plants 1 000 < 5 000 m3/d sludge treatment we propose to use combined access sludge thickening and dewatering unit. This solution enables reduce size of  sludge treatment building, reduce operation costs for electricity, wash water and polymers, and makes operation of sludge treatment equipment much more simple and robust.

    Our company has long term experience of design and construction of compact WWTP with N and P removal, using different biological treatment technologies.

    Reference list